All lengths are in meters using an average car length of 19m.
SUMMIT YARD
|
Summit Yard Dispatch Facility |
The first yard in Panamint Crossing was built at Towne Summit, elevation 5,056 feet (1541m) at what are now sidings 501 - 504. It served as a collection point between the Dolomite Canyon and Panamint Butte mines, and later, Cottonwood Canyon. With the discovery of precious metals came increased demand, forcing the construction of the terraced yard seen today, which still serves a vital purpose in reducing the number of runs along the route's steep grades. The summit yard tower controls all dispatch activities, including emergency response. In the present, the route's main line converges with three other loops, creating tricky switch-back operations on steep grades next to 1000 foot cliffs.
SIDING |
TYPE |
LENGTH |
CAPACITY |
GRADE |
NOTES |
101 |
LAYOVER |
248 |
13 |
1.5% |
Summit Yard South Layover |
102 |
LAYOVER |
406 |
21 |
1.5% |
Towne Pass South Layover |
201 |
SIDING |
1,724 |
90 |
1.5% |
Summit Long Siding 1 |
202 |
SIDING |
1,724 |
90 |
1.5% |
Summit Long Siding 2 |
203 |
SIDING |
945 |
50 |
3.5% |
Summit Bypass Siding South |
204 |
SIDING |
1,015 |
53 |
~6.5% |
Dolomite Bypass Siding |
301 |
SIDING |
2,268 |
119 |
0% |
Summit Long Terrace; Crane Accessible |
302 |
SIDING |
1,160 |
61 |
0% |
Summit Lower Terrace 1; Crane Accessible |
303 |
SIDING |
1,160 |
61 |
0% |
Summit Lower Terrace 2; Crane Accessible |
401 |
SIDING |
1,560 |
82 |
0% |
Summit Upper Terrace 1; Crane Accessible |
402 |
SIDING |
1,560 |
82 |
0% |
Summit Upper Terrace 2; Crane Accessible |
501 |
SIDING |
1,182 |
62 |
0% |
Summit Siding 1; Crane Accessible |
502 |
SIDING |
1,034 |
54 |
0% |
Summit Siding 2; Crane Accessible |
503 |
SIDING |
778 |
41 |
0% |
Summit Siding 3; Crane Accessible |
504 |
SIDING |
730 |
38 |
0% |
Summit Siding 4; Crane Accessible |
601 |
LAYOVER |
300 |
15 |
0% |
Summit Yard Layover North 1 |
602 |
LAYOVER |
142 |
7 |
0% |
Summit Yard Layover North 2 |
603 |
LAYOVER |
142 |
7 |
0% |
Summit Yard Layover North 3 |
604 |
LAYOVER |
142 |
7 |
3.5% |
Dolomite Bypass Layover |
701 |
SIDING |
640 |
33 |
3.0% |
Summit Bypass Siding North |
|
Summit Yard Facility |
ALKALI FLATS
DEVIL'S CORNFIELD
|
Devil's Cornfield |
By the early 1950s, the demand for petroleum products was on the rise, and Muza's Green Gases constructed an oil refinery located at 25 feet below sea level on a most inhospitable salt flat bordering Lake Manly, overlooking Death Valley's basin. To service this terminal, the PVA constructed the Devil's Cornfield Yard in 1958, a sprawling place with basic service for rolling stock, and gateway to Las Vegas.
PANAMINT SPRINGS
|
Panamint Springs |
This small yard serves as a collection point for raw materials taken from the surrounding valleys, which are rich in coal, limestone, and commercial-grade marble. When the new main lines were laid, the PVA diverted them around the national park settlement, while keeping the original line for passenger service into Panamint Springs. Lynto Stoneworks maintains a depot for concrete and cement at the Panamint Springs yard to serve the western end of the route.
SIDING |
TYPE |
LENGTH |
CAPACITY |
NOTES |
101 |
SIDING |
818 |
43 |
Panamint Springs Siding 1 |
102 |
SIDING |
820 |
43 |
Panamint Springs Siding 2 |
103 |
SIDING |
831 |
43 |
Panamint Springs Siding 3 |
104 |
SIDING |
826 |
43 |
Panamint Springs Siding 4 |
105 |
SIDING |
550 |
28 |
Panamint Springs Siding 5 |
201 |
SPUR |
395 |
20 |
Panamint Springs Lynto Depot 1 |
202 |
SPUR |
380 |
20 |
Panamint Springs Lynto Depot 2 |
203 |
SPUR |
350 |
18 |
Panamint Springs Lynto Depot 3 |
204 |
SPUR |
364 |
19 |
Panamint Springs Lynto Depot 4 |
301 |
SPUR |
120 |
6 |
Panamint Springs Steam Service 1 |
302 |
SPUR |
100 |
5 |
Panamint Springs Steam Service 2 |
303 |
SPUR |
85 |
4 |
Panamint Springs Steam Service 3 |